"CC is there, OC is coming" is one of the most misunderstood sentences in Indian real estate. Depending on the state, CC can mean the building is finished, or only that construction may start. Here is what the law says and how to check.
A completion certificate says a building was built as per the sanctioned plan. An occupancy certificate (OC) permits people to occupy it, with water, sanitation and electricity provided for. Both come from the local or development authority, not RERA. In Maharashtra, "CC" usually means commencement certificate, the permission to start building.
RERACertified™ Professional (RCP) covers promoter duties, project approvals and document checks. RERACertified sells this course. It is a private certification and does not replace state RERA agent registration.
See RERACertified™ Pro — ₹4,999 →| Commencement certificate | Completion certificate | Occupancy certificate (OC) | |
|---|---|---|---|
| Stage | Before or during construction | When construction ends | When the building is fit to occupy |
| What it proves | Work may start (often up to a stage, such as plinth) | Built as per sanctioned plan, layout and specifications | People may occupy; civic infrastructure provided for |
| Defined in RERA Act? | No | Yes, Section 2(q) | Yes, Section 2(zf) |
| Issued by | Planning or local authority | Competent authority (local or development authority) | Competent authority (local or development authority) |
| Called "CC"? | Yes, in Maharashtra | Yes, in many other places | No; "OC", BU permission, occupation certificate |
| Enough for "ready to move"? | No | Not on its own where an OC is also required | Yes, for the towers and floors it covers |
Section 2(q) of the Real Estate (Regulation and Development) Act, 2016 defines a completion certificate as the certificate, "by whatever name called", issued by the competent authority certifying that the project was developed according to the sanctioned plan, layout plan and specifications. Confirmed
The "competent authority" (Section 2(p)) is the local or development authority that can permit development of the land: a municipal body, GMADA, DTCP, AUDA, MHADA and so on. RERA itself issues neither certificate.
Section 2(zf) defines an occupancy certificate as the certificate, "by whatever name called", issued by the competent authority permitting occupation of any building, as provided under local laws, "which has provision for civic infrastructure such as water, sanitation and electricity". Confirmed
"By whatever name called" matters: Gujarat's BU permission, Haryana's occupation certificate and Delhi's occupancy-cum-completion certificate all count.
Across most of India, CC means the completion certificate. In Maharashtra, CC almost always means the commencement certificate: the planning authority's permission to start building. State-specific
A MHADA Building Permission Cell certificate from Mumbai, for example, is granted under Sections 44 and 45 of the Maharashtra Regional and Town Planning Act, 1966 "for work upto top of Plinth Level", with a "further commencement certificate" later. It also bars occupation until occupancy permission is granted. Confirmed
So a seller who says "CC is received" may be truthful and still describe a building nobody may yet live in.
Names come from local building laws, so they change at the border. We list only states we checked against an official document.
| State / area | Local name | Issued by (examples) | Part certificate? |
|---|---|---|---|
| Maharashtra | CC = commencement certificate (MR&TP Act ss. 44–45); OC = occupancy permission or certificate | Planning authority: municipal corporation, MHADA and others | Commonly issued for wings or floors; read the scope Reported |
| Gujarat | BU (Building Use) permission = occupancy certificate | Urban local body or development authority (e.g. AMC, AUDA); eNagar portal for many ULB services | Verify with the issuing body |
| Haryana | Occupation certificate, Form BR-VII (Haryana Building Code, Code 4.10) | Director, Town and Country Planning (DTCP) for licensed colonies; other bodies for their areas | Certificates often list the towers and floors covered |
| Delhi | Occupancy-cum-Completion Certificate (OCC), Unified Building Bye-Laws 2016 | Sanctioning authority (e.g. MCD, DDA, NDMC) | Yes: part OCC for at least one block complete in all respects (cl. 2.7.3) |
| Punjab (GMADA areas) | Notice of completion (Form B) and permission to occupy under Rule 11, PUDA (Building) Rules, 1996 | Estate Officer, GMADA or the relevant development authority | Form B covers "the building / a part of the building" |
| Other states | Usually "occupancy" or "occupation" certificate; sometimes combined with completion | Municipal body or development authority | Verify on the local authority portal |
All rows are state-specific and sourced below. Verify any certificate on the issuing authority's portal.
Large projects are often certified block by block. Delhi's bye-laws allow a part OCC for at least one block complete in all respects, and it does not extend the building permit. Confirmed
A part OC is enough only for the flat it covers. Read the towers and floors on the certificate itself; a flat in an uncovered tower is still, legally, under construction.
See how to check a builder's RERA registration. Portals differ in what they display; a missing upload is a question for the promoter, not proof either way.
Is it a deficiency in service? Yes: in Samruddhi Co-operative Housing Society Ltd. v. Mumbai Mahalaxmi Construction Pvt. Ltd. (Civil Appeal 4000 of 2019, 11 January 2022) the Supreme Court held the failure to obtain the occupation certificate a deficiency in service and a continuing wrong. Confirmed (judgment text) For choosing a forum, see RERA vs consumer court.
GST is tied to the completion certificate too. Under Schedule II, paragraph 5(b) of the CGST Act, building for sale is a supply of services except where the entire consideration is received after the completion certificate or first occupation, whichever is earlier. Confirmed
Yes, if you knowingly buy under construction. Then RERA protects you: a registered project, a registered agreement for sale, a declared completion date, and the promoter's duty to get the OC. Late possession remedies are explained in RERA possession delay compensation.
The risky case is a flat presented as ready with no OC for its tower. Our reading: since the Section 19(10) possession duty runs from the OC, a possession offer before one exists is weak ground for the builder.
| Untrained agent says | Trained agent knows |
|---|---|
| "CC is received, so it's ready." | In Maharashtra CC is usually the commencement certificate. Ask which CC, then ask for the OC. |
| "RERA has given the OC." | RERA never issues an OC. The local or development authority does (Section 2(zf)). |
| "The project has OC." | Many OCs are partial. Which tower and floors does it name? |
| "OC is applied, just a formality." | An application is not a certificate; deviations and pending clearances hold OCs up. |
| "No OC means no problem, people are living there." | Occupation before OC can bring higher taxes and charges, and the Supreme Court has treated the missing OC as a deficiency in service. |
The free India Real Estate Dictionary explains 1,000+ RERA, land record, legal and tax terms in plain words, with agent tips. The Professional Edition PDF (₹499, free with any course enrollment) adds a state RERA directory, unit conversion charts and checklists, and works offline on site visits.
Get the Dictionary PDF · ₹499 → Use the free online versionNeha is asked to market a 2 BHK in Tower C of a Pune project as "ready to move, OC/CC done". She checks first.
| What she was told | What she found | Meaning |
|---|---|---|
| "CC done" | A commencement certificate up to plinth, plus a further CC for upper floors | Permission to build. Says nothing about completion. |
| "OC done" | A part occupancy certificate naming Towers A and B only | Tower C cannot be legally occupied yet. |
| "RERA approved" | Project registered; Tower C's completion date still ahead on the portal | It is, on paper, an under-construction unit. |
| "Families already living" | Some Tower C flats occupied | Occupation without OC: a risk for those owners, not a reassurance. |
Neha lists it as "near completion, Tower C OC awaited", quotes the project RERA number and her own (Section 9(5)), and tells the buyer in writing to compare the price with under-construction stock and to check the completion date in the agreement. She loses a headline and avoids a Section 31 complaint.
See also the property due diligence checklist, the resale property checklist and agreement for sale under RERA.
RERACertified™ Pro covers the RERA Act, promoter and agent duties, project approvals and your state track, with a 100-question final exam and a verifiable certificate.
Enroll in RERACertified™ Pro — ₹4,999 →RERACertified sells this course. RERACertified™ Pro is a private certification and does not replace state RERA agent registration.